RTU Research Information System
Latviešu English

Publikācija: A Model for Maximizing the Profit of a HPP Cascade Considering Hydraulic Link via Reservoirs

Publication Type Full-text conference paper published in conference proceedings indexed in SCOPUS or WOS database
Funding for basic activity Unknown
Defending: ,
Publication language English (en)
Title in original language A Model for Maximizing the Profit of a HPP Cascade Considering Hydraulic Link via Reservoirs
Field of research 2. Engineering and technology
Sub-field of research 2.2 Electrical engineering, Electronic engineering, Information and communication engineering
Authors Anatolijs Mahnitko
Jānis Gerhards
Tatjana Lomane
Renāta Varfolomejeva
Vladislav Oboskalov
Konstantin Koljasnikov
Keywords HPP cascade, regime, capacity, head level, time flow lag of water
Abstract At the conditions of market relationships and economic and financial independence of power companies, these are guided by the principle of achieving maximum efficiency in their actions. In the article is considered the problem formulation of HPP cascade operational mode determination, ensuring maximum profit from the sales of the generated electric power at the day-ahead market. Dynamic volumes of reservoirs are taken into account using the lag time between the waves of HPP water flow. The problem solution using the method of statistical modelling is approbated on the example of hypothetical cascade of three HPP. The results of the modelling of cascade operating regime are illustrated graphically. References 5, figure 1, table 1.
Reference Mahnitko, A., Gerhards, J., Lomane, T., Varfolomejeva, R., Oboskalov, V., Koljasnikov, K. A Model for Maximizing the Profit of a HPP Cascade Considering Hydraulic Link via Reservoirs. In: Proceedings of PPE-2016 Conference, Ukraine, Kiev, 6-10 June, 2016. Kiev: 2016, pp.246-249.
ID 23069