Analysis of Quality Control Plans for Bridge over the River Maza Jugla Accoring to COST TU 1406 Methodology
IOP Conference Series: Materials Science and Engineering 2021
Roberts Auziņš, Ainārs Paeglītis

Bridges are one of the most expensive parts of the road network, and therefore in the bridge management process, it is very important to make the most technically and cost-effective decisions to planned actions (such as maintenance, rehabilitation and reconstruction works). Decisions must be based both on the current situation and possible future options and alternatives. The European Cooperation in Science and Technology (COST) during the action TU 1406 “Quality specifications for roadway bridges, standardization at a European level (BridgeSpecs)” in the period from 2014 to 2019 has organized the framework for the development of bridge Quality Control Plans (QCP) including the system of data collection, data processing and outcomes. This article analyses and compares different Quality Control Plans developed according to COST TU 1406 methodology for the existing bridge over river Maza Jugla, located on regional road P10 km 34,80 in Latvia.


Keywords
bridge, bridge stock, inventory, inspection, maintenance, condition, load model
DOI
10.1088/1757-899X/1202/1/012028

Auziņš, R., Paeglītis, A. Analysis of Quality Control Plans for Bridge over the River Maza Jugla Accoring to COST TU 1406 Methodology. IOP Conference Series: Materials Science and Engineering, 2021, Vol. 1202, Article number 012028. ISSN 1757-8981. e-ISSN 1757-899X. Available from: doi:10.1088/1757-899X/1202/1/012028

Publication language
English (en)
The Scientific Library of the Riga Technical University.
E-mail: uzzinas@rtu.lv; Phone: +371 28399196