Optimisation of Building’s Construction Costs and CO2 Emission Based on the Computer Model of a Theoretical Office Building Located Near London
2015
Weronika Lechowska

The results of the building optimisation presented in this article come from the author’s entry project in the Design Optimisation Competition 2014. Simulations were conducted to help to design an office building and to minimise its costs and impact on the environment. Ultimately, the building’s construction costs were reduced to £2,294,216 and annual CO2 production to 136,169.3 kg, while maintaining discomfort hours below 200 hours per year and daylight floor area above threshold on the level of 60.0 %


Atslēgas vārdi
Building optimisation, CO2 emission, construction costs
DOI
10.1515/aup-2015-0002

Lechowska, W. Optimisation of Building’s Construction Costs and CO2 Emission Based on the Computer Model of a Theoretical Office Building Located Near London. Arhitektūra un pilsētplānošana. Nr.10, 2015, 13.-20.lpp. ISSN 1691-4333. e-ISSN 2255-8764. Pieejams: doi:10.1515/aup-2015-0002

Publikācijas valoda
English (en)
RTU Zinātniskā bibliotēka.
E-pasts: uzzinas@rtu.lv; Tālr: +371 28399196