Specifics of Hydropower Plant Management in Isolated Power Systems
Przeglad Elektrotechniczny 2022
Sherkhon Sultonov, Murodbek Safaraliev, Sergey Kokin, Stepan Dmitriev, Inga Zicmane, Shokhin Dzhuraev

The paper describes the distinctive features of the isolated power system of Tajikistan, significant part of which is constituted by the hydropower plants; identifies the main problems of the electric power system of the Republic of Tajikistan in terms of power generation; describes specific features of HPP cascade management; proposes a method of determining the alternative fully drawn down level of the Norak HPP reservoir, taking into account the water level requirements in various water volume conditions from the point of view of power generation increase; estimates the economic efficiency of reducing the deficit of electricity in the power system with view to long-term optimization.


Atslēgas vārdi
Hydropower resources; Norak HPP; Optimization; Power generation; Power system of Tajikistan; Vakhsh cascade
DOI
10.15199/48.2022.04.12
Hipersaite
https://sigma-not.pl/publikacja-136952-2022-4.html

Sultonov, S., Safaraliev, M., Kokin, S., Dmitriev, S., Zicmane, I., Dzhuraev, S. Specifics of Hydropower Plant Management in Isolated Power Systems. Przeglad Elektrotechniczny, 2022, Vol. 4, 53.-57.lpp. ISSN 0033-2097. Pieejams: doi:10.15199/48.2022.04.12

Publikācijas valoda
English (en)
RTU Zinātniskā bibliotēka.
E-pasts: uzzinas@rtu.lv; Tālr: +371 28399196